Ron and Barb Trosclair – BBF Builders

Trosclair Family with BBF Builders

We are continuing with the Sunday School remodel at South Drive Baptist Church in Channelview, Texas. The electricians have completed the electrical rough in and the sheet rock is all installed. The AC guys have a new unit installed and all of the old duct work has been replaced. The plumber has completely re-plumbed the entire building with new pipes and all new shut offs and connections. He even installed a new on demand water heater that will service the entire building. The entire fire alarm system has been replaced. The new phone and internet system is installed along with the new WiFi system. We are in the process of spraying texture on the walls and painting. The suspended ceiling grid is installed. New lighting will be installed next week, followed by installing all interior doors. We are making great progress and are planning for a September completion date.

I saw the Orthopedic surgeon and he said I need surgery to repair my torn rotator cuff. We have elected to wait until after this project is completed to have the surgery. It will make rehab much easier. He said I will be down about 6 to 8 weeks following the surgery. Please pray for my wife as she will be my caretaker during my rehab. I’m going to try to be a good patient.

Thank you for your continued prayers for the BBF Builder Ministry,

Ron and Barb Trosclair

Scroll to Top